In the Capacity Market “Metered Volume” means, means for a CMU, DSR CMU Component or Generating Unit and a Settlement Period, the net aggregate volume of Active Energy (for all Meter Points applicable to the CMU), determined at the Boundary Point of the Transmission Network which flowed in that Settlement Period to or from that CMU or DSR CMU Component or Generating Unit or, in the case of an Interconnector CMU, through that CMU into the GB Transmission System. In CfD “Metered Volume” means the net aggregate volume of Active Energy, measured by one or more Meters, which flowed in that Settlement Unit to or from the Facility.

Suggest content changes